When the rain cleared, the floor was finished and we had to remove all of the steel support structure in the ceiling of the old Control room. This had to be done to provide clearance for the new walls that have to be built as well as the test samples when we are operational. We are still on schedule for a June 21st opening.


Construction-Preparing for Wall Construction