NWAA Labs Construction Pictures

After the cutting was finished we had to fill all of the holes in the floor with rebar and a "floor" to hold the one foot of concrete filling them. We also had to pour a cap of three inches of concrete in the "source" room since the holes were raised 1 inch from the plane of the floor. We intend to use the source room as a reverberation chamber to measure "Absorption Coefficents" and "Scattering Coefficients" so the floor had to be flat for the turntable to be able to turn correctly.


Construction-Preparing the Floor Holes


Click the Thumbnail to See a Larger Image.

Future Receive RoomFuture Receive Room

Receive Room Holes to be FilledReceive Room Holes to be Filled

Be Careful. That First Step Down in the Hole is 30Ft.Be Careful. That First Step Down in the Hole is 30Ft.

A Lot of Work Removing That Steel in the CeilingA Lot of Work Removing That Steel in the Ceiling

Working in the Source Room to Seal the HolesWorking in the Source Room to Seal the Holes