Complete High-speed Speaker and Material Testing

 
 

NWAA Labs Construction Pictures

The day of the first pour dawned cold and sunny and at 7:30am we started setting up the concrete pumping truck. Access to the room had to be rigged through a wall, through another wall and then 150ft of hose to get to the holes.The pour went well and only took until 4 PM to pour all 25 cubic yards of concrete and to finish the source room floor and close the existing door between the source room and future receive room.


Construction-1st Concrete Pour


Click the Thumbnail to See a Larger Image.

They Told Me That Concrete in That Room was Going to be EASY!They Told Me That Concrete in That Room was Going to be EASY!"

Me(Ron Sauro), Supervising the 1st PourMe(Ron Sauro), Supervising the 1st Pour

Filling Holes and Pouring the Footing for the Receive Room.Filling Holes and Pouring the Footing for the Receive Room.

Filling Holes in the Source RoomFilling Holes in the Source Room

Sealing the Old DoorwaySealing the Old Doorway

I Think My Boot is Lost!I Think My Boot is Lost!

Remember...He Said Level!Remember...He Said Level!

Source Room Floor FinishedSource Room Floor Finished