NWAA Labs Construction Pictures
The day of the first pour dawned cold and sunny and at 7:30am we started setting up the concrete pumping truck. Access to the room had to be rigged through a wall, through another wall and then 150ft of hose to get to the holes.The pour went well and only took until 4 PM to pour all 25 cubic yards of concrete and to finish the source room floor and close the existing door between the source room and future receive room.
Construction-1st Concrete Pour